It will calculate the volume increase of the material using the swell/bulking percentage from Bank to Loose volume. A dump truck holds anywhere from 10 to 14 cubic yards of material. Length of Excavation: ft: Width of Excavation: ft: Depth Point A: ft: Depth Point B: ft: Depth Point C: ft:

WhatsApp: +86 18221755073
CM 2113 Exam 2 Flashcards

For bulk materials, volumetric measure varies with the material's position in the construction process. ... the soil by digging. Loose Volume. Which of the following soil volume is used to determine the volume capacity of excavating and hauling equipment? Weight. Soil density is a measure of _____ per unit of volume. Natural. A soil's bank ...

WhatsApp: +86 18221755073
floor The excavation equipment will be a track mounted …

Working space 2' Volume Calculations: Total working space: 4+ 2(2) = 8' Excavation length: 180 + 8 = 188' Excavation width: 60 + 8 = 68' Excavation area: 188 x 68 = 12 784 ft 2 Excavation volume: 12 784 x 4 = 51 136 ft 3 Convert volume to yd 3 51 136 ÷ 27 = 1893.8 yd 3 Use 1894 yd 3 Select Equipment: 31 23 16.42 Excavating, Bulk Bank ...

WhatsApp: +86 18221755073
Solved Situation:

- State your assumptions and concerns if you have any. 31 it 3 Excovation and 3123 Excavation and Fill 0010 EXCAVATING, UTIUTY TRENCH 0011 Cenmen satil 312316.42 Excavating, Bulk Bank Measure प1010 EXCAVATING, BULK BANK MEASURE 007l Conrmen enth pilat 628 For customer support on your Residential Costs with RSMeans data, call 800.448.8182.

WhatsApp: +86 18221755073
What are bulk excavations

Bulk excavations involve the removal of large amounts of soil, rock, or other material from site, in preparation for a construction project. Excavations are often required for residential or commercial projects to bring …

WhatsApp: +86 18221755073
2a. Excavating and Lifting

Construction Methods 110401542 2a. Excavating and Lifting Dr. Khaled Hyari Department of Civil Engineering Hashemite University Introduction • Excavator: A power-driven digging machine • Three Major types of excavators: – Hydraulic excavators: backhoe – Cable-operated crane-shovel family • Shovels • Draglines • Hoes • Clamshells – Dozers, loaders, and scrapers 2a - ٢ ١ ...

WhatsApp: +86 18221755073
Earthwork Cut and Fill Calculations

In Situ, bank measure: soil as it is currently on-site. This is soil that has supposedly been at rest for a while. Even if it was compacted initially it has expanded gradually over to time to be at its current at-rest condition. Bulk Size, Swell, Transport Size, Loose, Expanded, Excavated: This …

WhatsApp: +86 18221755073
9 Common Excavation Hazards and their Preventive Measures …

Excavating machinery consisting of both light and heavy types shall be kept back from the excavation site at a safe distance. ... The local health authority's preventive measures shall be given due heed before the commencement of the work. 7. Safety of Materials. Materials required for excavation, like planks for gangways, ropes, and walkways ...

WhatsApp: +86 18221755073
Excavation Calculator

This calculator will calculate the volume of excavated material using the length and width of the excavation in feet and the excavation depth from an average of four points. It will calculate the volume increase of the material using the …

WhatsApp: +86 18221755073
MATERIALS. On nearly all earthmoving and mining …

adds to its bulk. This change from bank to loose measure is commonly know as swell, and is given in percent of swell. This is best illustrated in the following figure. Swell Factor (SF) = 100 / (100 + % of Swell) …. (1) % of Swell = (100 – 100*SF) / SF …. (2) According to this definition SF is always less than 1.0 ...

WhatsApp: +86 18221755073
Civil Engineering Site Development Project

Table 4 - The Best Way to Table 3 Line Number 312316420305 312323208170 312323154080 312323156050 312323144020 312323236200 Description Excavating, bulk bank measure, 2.7 m3 capacity = 229 m3/hr, backhoe, hydraulic, crawler mounted, excluding truck loading Cycle hauling (wait, load, travel, unload or dump & return) time per cycle, excavated or ...

WhatsApp: +86 18221755073
EECA Cost Projection

Excavating, Bulk Bank Measure, Common Earth CY trucks making four roundtrips) transport/stockpiling, & loading on 25,472 LCY 1 800 NA $ 2.23 1 $ 56,882 $ 56,882 F 1 -1.60% 1 1 Piled, Front end loader, wheel mounted, 5 CY Rate based on RSMeans 2021, 312316421650 x 1.63 (DoD Area Cost Factor ...

WhatsApp: +86 18221755073
Earthwork: What's a Cubic Yard?

The life of dirt on a construction site is a violent one! Say that we excavated this 3,704 cy hole and trucked the dirt down to one of the goals. Once we finished stockpiling the 3,704 cy of dirt you get out a wheel, a tape measure, or a survey instrument and measure the volume of dirt laying loose in the pile. It measures 4,260 cy, not 3,704 cy.

WhatsApp: +86 18221755073
Cm 2113 Exam 2 (Quizzes) Flashcards | Quizlet

Study with Quizlet and memorize flashcards containing terms like The three basic components of soil are ______, ________, and __________., For bulk materials, volumetric measure varies with the material's position in the construction process., The same weight of a material will occupy different volumes as the material is handled on the project. and more.

WhatsApp: +86 18221755073
CE 616 Online Midterm Exam Spring 2021 CE616852

1. Free float 2. Total float 3. Dummy arrow 4. Logic loop Free Float is the amount of the time any activity can be delayed withouth adverse effect on early start of following acitivty Total Float is the amount of time an acityvity can be delayed without adverse effect on overall time of the project completion Dummy Arrow : A way of indicating the completion of one acitvity …

WhatsApp: +86 18221755073
CEE 422 HW3 .docx

Estimate the total cost and the cost per cubic yard, bank measure, for excavating and hauling the earth. ... 5150 Item Name Excavation and Fill → Excavating, Bulk Bank Measure → Excavator, hydraulc, crawler mtd. → 1-1/2 C.Y. cap Crew 12A 1 Equip. Oper. (crane) ...

WhatsApp: +86 18221755073
Reclamation Cost Estimate 12.4.15

Excavating, bulk bank measure, 3.5 CY, hydraulic excavator, crawler mounted 31 23 16 42 0305 $1.56 BCY 60 BCY 60 LCY $93.60 Subtotal $15,143.60 Total $40,092.34 BCY - bank cubic yard CY - cubic yard HP - horsepower LCY - loose cubic yard MPH - miles per hour. PROJECT: Daneros Mine Rec. Cost. Est. COMPUTED BY : RE CHECKED BY: AR

WhatsApp: +86 18221755073
  • Copyright © .zingbox All rights reserved.sitemap